We often work in close proximity to retained infrastructure and public areas. It is therefore necessary to prevent any fragments that could otherwise cause damage being liberated. This is achieved by a number of means including use of minimal charge sizes and optimisation of placement of charges but the final control measure is the use of suitable blast containment materials.

Materials typically used for this purpose are reclaimed steel plate, geotextile fabric and chainlink .  Precision Demolition Company maintain large stocks of geotextile and chainlink in the appropriate grades  as bulk purchasing allows us to get the best possible rates and our staff are familiar with the optimal use and installation methods required in differing circumstances.